A modern stone and glass house on a rocky shore with a metal walkway down to a floating dock and a small white motorboat, on a calm inlet under a clear blue sky
Neighbourhood Guides/
Save

Buying a Waterfront Home in Belcarra: The Dock, the Licence and What to Check

A waterfront house in Belcarra comes with a question most buyers never meet: who controls the water in front of it. This guide explains the port authority permit and licence for a private dock on Indian Arm, the Bedwell Bay limit on new docks, the rules for older docks, and the papers to ask for before you remove subjects.

Michael Goering, BC-licensed REALTOR®

Michael Goering·BC-licensed REALTOR®

A waterfront house in Belcarra comes with a question most home buyers never have to ask: who controls the water in front of it? The answer is a federal agency, and its rules decide whether the dock you see in the listing photos can stay, be repaired or be replaced. This guide explains those rules in plain words, and lists the papers we would ask for before writing an offer on any Belcarra house with a dock.

If you want to see what is for sale now, our Belcarra house page shows the current listings, with the board's price figure for the area.

Who controls the water in front of the house

The water along the Belcarra shore is part of Indian Arm and Burrard Inlet. The Vancouver Fraser Port Authority manages it. In its private dock guideline (November 2024), the port authority says it is responsible, under the Canada Marine Act, for the land and water within its area, and that this includes the waters next to homes along Burrard Inlet, Indian Arm and Port Moody Arm.

For a buyer, this means the dock is a separate thing from the land. You buy the house and the lot from the seller. The right to keep a dock in the water in front of it comes from a licence agreement with the port authority. The guideline says a waterfront owner who has, or wants, a private dock in front of their home must get a project permit and enter into a licence agreement before installing it.

We think this is the single most important point for a Belcarra waterfront buyer. Two houses side by side can look the same in photos. One may have a dock with a current licence and permits on file. The other may have a dock with no papers at all. Those two houses are not worth the same, and the listing price may not show the difference.

What needs a permit

The guideline is clear that the permit is not only for new docks. A port authority project permit is required for:

  • a new private dock, for one owner or shared
  • maintenance, upgrades or repairs to an existing private dock
  • removal of an existing private dock

Applications go through the port authority's online review process. The port authority also says other approvals may be needed, for example from Transport Canada under the Navigation Protection Act, from Fisheries and Oceans Canada under the Fisheries Act, or from the village.

For a new dock, the application needs drawings from a BC certified professional engineer, a site plan, photos of the shoreline, proof of at least 1.5 metres of water under the float at low tide, and a survey by a qualified environmental professional. The port authority may also ask for an archaeological assessment. This is a real project, with real costs, before any work starts.

The Bedwell Bay limit on new docks

Belcarra has two main stretches of shoreline that buyers ask about: the homes facing Indian Arm and Burrard Inlet, and the homes on Bedwell Bay. The guideline treats Bedwell Bay differently.

The port authority says it continues to restrict applications for new docks in Bedwell Bay. It gives two reasons. New docks there could affect the environment, and they could affect First Nations cultural values for the area. The guideline describes Bedwell Bay as one of the largest remaining eelgrass beds in Burrard Inlet, with cultural importance for First Nations groups.

The practical result is simple. If a Bedwell Bay house has no dock today, buy it on the basis that it will not get one. If the house you love has a licensed dock on Bedwell Bay already, the value of that licence is worth extra care in your subject period.

Older docks and the 2020 line

Many Belcarra docks were built long before the current guideline. The port authority addresses this directly. It says licensed private docks that existed before 2020 may not meet every design rule, and that these docks are exempt from the guideline until a replacement or upgrade is needed. Its examples are new floats, a new pier, new pilings or other structural parts. Exempt docks must still follow the terms of their licence, including the duty to maintain and repair them.

When the replacement day comes, the new rules apply. The guideline says the port authority will require the design and location rules in its Section 3.1 for any replacement or upgrade.

The exemption can also be lost. The guideline lists factors that can remove it, such as a dock in an important environmental area, a dock that is not kept usable and safe, a dock that is not in its original approved location, and a licence holder who is not following the licence terms.

So when you look at an older dock, ask two questions. When will its floats, pier or pilings need replacing? And would the dock, rebuilt to today's rules, look like the one in the listing photos?

The size and design rules for a new dock

These are the rules a new dock, or a replaced one, must follow under the November 2024 guideline. They help you judge whether an older, larger dock could be rebuilt at the same size.

Part of the dockRule in the guideline
Total length (pier, ramp and float)No more than 60 metres from the head of the pier at the high water mark
Moorage floatAs small as possible, at most 30 square metres
Fixed dockAs small as possible, at most 15 square metres
Pier and access rampAt most 1.8 metres wide
Distance from the navigation channelAt least 30 metres
Distance from neighbouring floats and piersAt least 10 metres
Water under the float at low tideAt least 1.5 metres
Clearance under the boat's keel at low tideAt least 10% of the boat's draft

Source: Vancouver Fraser Port Authority, Private residential dock guideline for Burrard Inlet, November 2024.

The guideline adds other rules. Docks must sit at right angles to the shoreline. They must keep public access along the beach between the high and low water marks. Dredging cannot be used to reach the required depth, and fill cannot be placed below the high water mark. Decking should let light through to the water, and new creosote-treated structures are not allowed.

What you cannot put on a dock

The guideline lists uses that are not permitted on a private dock. Some of them surprise buyers who are used to lake cabins:

  • boat houses or boat shelters
  • mooring buoys
  • marine ways and marine railways
  • house boats, float homes and other liveaboard boats
  • commercial use, such as moorage for water taxis or float planes
  • storing items that are not needed for safe moorage, such as picnic tables, cabanas, storage sheds, patios, sun decks, hot tubs and barbecues

If a listing shows a hot tub or a seating area on the float, ask how that fits with the licence. It may have been there before the current rules, or it may be a problem the new owner inherits.

Shared docks

The port authority encourages owners to consider a shared dock before applying for a private one, because shared docks reduce the number of structures along the shore. Shared docks are charged at shared licence rates. If a Belcarra house has a share in a dock with a neighbour, ask for the written agreement between the owners, along with the licence. Who pays for repairs, and who decides when to replace the floats, should be on paper.

The rest of a waterfront purchase: water and septic

A waterfront buyer in Belcarra also needs to check the same two things every Belcarra buyer checks.

The first is the septic system. The Village of Belcarra says everyone in Belcarra uses a septic tank system of some kind. A septic system treats the household waste water on the lot itself, in a tank and a drain field. The village advises owners to pump the tank every 3 to 5 years. Book a septic inspection in the subject period and ask the seller for the pumping records. On a waterfront lot with rock close to the surface, the size and condition of the drain field matter.

The second is the water supply. The village runs a drinking water system, and some homes use private or shared wells. Village Policy 184 sets when a property that fronts the water system must connect to it. A home that uses a shared well on another lot with no registered easement must connect, and a new lot or the rebuild of an existing lot must connect, because the village permits no new wells. If you plan to rebuild a waterfront house, add the connection to your budget.

Our guides to septic inspections and well water flow tests explain what each test covers.

Trees and views

Many Belcarra houses have a view down the inlet through tall trees. The village has a bylaw called the Managing Trees, Views & Landscapes Bylaw (No. 589-2021). If part of your plan is to prune or remove trees to open a view, ask the village what the bylaw requires before you write the offer. Do not assume the view in the photos can be made wider.

The papers we would ask for

Before you remove subjects on a Belcarra house with a dock, we suggest you have these in hand:

  1. The current licence agreement with the port authority, and its term.
  2. Every project permit the dock has had, with dates and what work each one approved.
  3. Any engineering drawings for the dock.
  4. A written answer from the port authority on what it needs, from the seller and from you, for the licence when the house is sold.
  5. For a shared dock, the written agreement between the owners.
  6. Septic pumping records and the result of your own septic inspection.
  7. Confirmation of the water source: village system or well, and the well's test results if there is one.

Your lawyer should read the licence and the shared dock agreement. A marine contractor or engineer can tell you how many years the floats and pilings have left. Ask your home insurer for a quote that names the dock.

When we help a buyer look at Belcarra waterfront, we treat the dock as its own item with its own value. We ask the listing agent for the dock papers at the first showing, before an offer is written, so the buyer is not waiting on them during a short subject period. We would rather a buyer lose a week than buy a dock they cannot keep.

If you are weighing Belcarra against other places on the water, or if you own a waterfront house here and are thinking of selling, book a 20-minute chat with the FRIVE team. You can also browse the current Belcarra listings, or read our guide to living in Belcarra for the rest of what changes when you move to the village.

Questions we get

Frequently asked questions

Who controls the water in front of a Belcarra waterfront home?

The Vancouver Fraser Port Authority, a federal agency. Its private dock guideline says it manages land and water in its area under the Canada Marine Act, and that this includes the waters next to homes along Burrard Inlet, Indian Arm and Port Moody Arm. A dock there needs the port authority's permit and licence.

Do I need a permit to build a dock at a Belcarra house?

Yes. The port authority's November 2024 guideline says a waterfront owner who wants a private dock in front of their home needs a project permit and a formal licence agreement with the port authority before the dock is installed. Other federal, provincial or village approvals may also apply.

Plan on no. The port authority's guideline says it continues to restrict applications for new docks in Bedwell Bay, because of possible effects on the environment and on First Nations cultural values there. It describes Bedwell Bay as one of the largest remaining eelgrass beds in Burrard Inlet.

Yes. The guideline says a port authority project permit is needed for maintenance, upgrades or repairs to an existing private dock, and for removing one. Ask the seller for every permit the dock has had, so you know what work was approved and when.

The guideline says licensed private docks built before 2020 are exempt from its design rules until a replacement or upgrade is needed, such as new floats, a new pier or new pilings. At that point the port authority requires the new design and location rules. The exemption can also be lost in some cases, for example if the dock is unsafe.

Under the November 2024 guideline, the whole dock (pier, ramp and float) can be no longer than 60 metres from the high water mark. The float can be at most 30 square metres, the fixed part at most 15 square metres, and the pier and ramp at most 1.8 metres wide.

No. The guideline lists uses that are not allowed on a private dock. They include boat houses or boat shelters, mooring buoys, house boats and float homes, and storing items not needed for safe boat moorage, such as picnic tables, sun decks, patios, hot tubs and barbecues.

The guideline asks for at least 1.5 metres of water below the float at low tide, and at least 10% of the moored boat's draft as clearance under the keel at low tide. Dredging cannot be used to reach that depth, so a shallow shoreline can rule out a new dock.

No village sewer serves Belcarra houses. The Village of Belcarra says everyone in Belcarra uses a septic system of some kind. A waterfront buyer should book a septic inspection in the subject period and ask for the pumping records.

Ask for the current port authority licence agreement, every project permit for the dock, any engineering drawings, recent photos of the dock, and the septic and water records for the house. Your lawyer should read the licence before you remove subjects.

We do not know of a rule that moves it on its own. Ask the port authority, in writing and before you remove subjects, what it needs from the seller and from you for the licence when the house is sold. Your lawyer should review the answer.

Sources

  1. Project and Environmental Review Guideline: Private residential dock guideline for Burrard Inlet, Vancouver Fraser Port Authority (November 2024, accessed 2026-11-18)
  2. Septic Tank Sewage Disposal Systems, Village of Belcarra (Accessed 2026-11-18)
  3. Corporate Policy No. 184, Conditions Requiring Connection to Potable Water Service, Village of Belcarra (Approved February 13, 2012, accessed 2026-11-18)
  4. Bylaws (list of current village bylaws), Village of Belcarra (Accessed 2026-11-19)
End of article

Found this useful? Share it.

A neighbour, a partner, a friend who's two FHSA contributions away, send it their way.

Save